Brightcore EDGE™ cooling for data centers

Reduce data center
cooling power.
Redeploy it as compute.

Brightcore's next-generation geothermal cooling solution for new and existing data centers reduces the power required for cooling which in turn unlocks additional compute capacity.

Power

75 to 85%

Reduction in peak cooling power

Compute

10 to 20%

Increase in compute, same site power

Efficiency

1.09pPUE

Improvement vs. 1.30 to 1.43 conventional

Water

0WUE

Eliminated with fully closed-loop cooling

The problem

Cooling competes with compute for power.

At up to 35% of total site energy, cooling is the largest non-IT data center load. Every megawatt spent on cooling is a megawatt of compute that cannot be monetized.

The solution

Rethink cooling with Brightcore EDGE™.

Brightcore EDGE™ is a hybrid cooling platform that delivers the lowest watt-per-token cooling available by optimizing geothermal cooling with dry coolers and optional chillers. Stop relying on outdoor air for heat rejection when conventional equipment is least efficient.

25–35%

Conventional coolingof total site power consumed by cooling

4–6%

Geothermal with Brightcore EDGE™of total site power consumed by cooling

The result

The lowest watt-per-token of any cooling solution.

Same Site. Same Power. Nineteen percent more compute.

Conventional cooling
Brightcore EDGE™
Conventional cooling: rows of chillers and dry coolers beside the data center building.
Conventional cooling
Brightcore EDGE™: a few dry coolers beside the building and the geothermal borefield piping below grade.
Brightcore EDGE™

Illustrative example: 250 MW IT facility in TX

IT compute250298 MW
Cooling power6013 MW

Bars drawn to scale against total site power

Metric
Conventional
Brightcore EDGE™
IT compute
250 MW
298 MW
Cooling power
60 MW
13 MW
Total site power
325 MW
325 MW
Peak PUE
1.30
1.09

How it works

Reject heat to the ground when the outside air is hot.

Conventional cooling systems reject heat to outdoor air, so they work hardest on the hottest days. Brightcore EDGE™ sends heat into naturally cool ground using only pumps and underground piping. Dry coolers and optional chillers run when conditions favor them. Brightcore EDGE™ software determines the most efficient option at every moment.

SUBSURFACE Dry coolers Chillers (optional) Chilled water loop Brightcore EDGE™ Data center cooling load Geothermal borefield
01

Measure

Reads live load, equipment, and weather data.

02

Predict

Forecasts cooling demand and outdoor conditions.

03

Operate

Operates geothermal, dry coolers, and chillers.

04

Optimize

Ground temperature is tracked across seasons and years to keep the borefield in balance.

System design

Brightcore EDGE™ active optimization allows for a much smaller borefield to do the work.

2 to 3xsmaller borefield than traditional geothermal

The Result: Geothermal for any geography, site, and scale.

Data center campus with geothermal piping routes lit across the site and the borefield shown as illuminated bores below grade.
Traditional geothermal
Brightcore EDGE™
Site fit
Often needs land beyond the site
Within the site footprint, under parking lots, external cooling and power equipment
Deployment time
Years
Months
CAPEX
Higher than conventional cooling
Comparable to conventional cooling
Geography
Limited by available land
All geographies

Economics

Reduce cooling power. Add compute.

Lower energy spend

10 to 20%

less site energy

Add compute

75 to 85%

cooling power reduction

Illustrative example

Abilene, Texas. A 250 MW IT site.

48MWadded IT compute
$706Madded annual revenue
$4.1Bin 15-year NPV
Assumptions
  • 15-year NPV against a chiller-only baseline.
  • 10 percent WACC.
  • High-performance compute at $400k per rack cost and $150k per rack per year in revenue.
  • Electricity at $0.10 per kWh.
  • Results vary by site, geography, and configuration. Illustrative only.

Deployment

Deployed in months.

Modular borefield design means installation happens in phases so cooling comes online as it gets built, minimizing speed to first token.

6months

to install a borefield for a 250 MW-IT site

Additional benefits

0 WUE

Fully closed loop.

Chillers optional

Reduce or remove them entirely.

Reduce noise

50 to 85% fewer dry coolers/chillers.

24/7/365

100 percent of the cooling load, every hour.

Fewer moving parts

Fewer failure points. Less maintenance.

50 year+

Asset life. No replacement cycle.

About Brightcore

Building Energy Performance since 2015.

120+employees in the U.S. and Sweden
500+completed projects
50+data center, IT, and telecom geothermal projects by Brightcore Swedish team

Brightcore Energy is a leading clean energy solutions provider based in Armonk, NY. We plan, design, build, and manage geothermal and other energy efficiency projects for large commercial and institutional clients.

Recognition

  • Inc. 5000
  • Great Place to Work
  • Forbes 2024 Best Startup
  • Inc. Best Workplaces
  • Crain's Notable Leaders in Sustainability
  • ENR 2024 Best Projects NY
What does it cost compared to conventional cooling?

Comparable upfront cost. Lower ongoing cost.

How much land does the borefield need?

No land beyond your site. The bores run below grade, under parking lots and buildings.

Does it work in hot climates?

Yes. Heat goes into the ground, which stays cooler than the air. Brightcore EDGE™ works in all geographies.

What happens on the hottest day of the year?

The borefield takes the peak. The rest of the system works around it, so the full cooling load is met.

Can it be added to an existing data center?

Yes. Brightcore EDGE™ works with your existing cooling architecture and can be phased in while the site stays live.

How long does installation take?

Six months for a 250 MW borefield.

Get started

Connect with an Expert.

Tell us about your site. We will show you what Brightcore EDGE™ can return.